Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Lockeridge Bridge | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654
Case Study Case Study

Lockeridge Bridge

Client: Balfour Beatty Civil Engineering

Location: South West

Products: Eliminator Bridge Deck Waterproofing – Two Coat

Route One carried out waterproofing using Stirling Lloyd’s Eliminator Two Coat System at Lockeridge Bridge as part of the refurbishment works.

The works consisted of enclosed shot blasting to the bridge deck before application of the Eliminator waterproofing system. The works were all carried out in one daytime shift.

  • >80m2 deck preparation (enclosed shot blasting)
  • Two coat Eliminator waterproofing and Tack Coat No2
  • Works completed in one day shift