Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
Ingarsby | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One Highways Ltd worked alongside AMCO Maintenance on this scheme which saw them offering the refurbishment of a disused structure. The structure is situated in the preserved, deserted, medieval village of Ingarsby.

Case Study Case Study

Ingarsby

Client: Amalgamated Construction Ltd (AMCO)

Location: East Midlands

Products: Stirling Lloyd Hytec Sheet Waterproofing, GEO 1000 Protective Matting, Metal Fixing Strips

The Ingarsby Bridge was awarded to Amalgamated Construction by The Department of Transport.  Route One successfully installed the Stirling Lloyd Hytec Sheet Waterproofing system as per the manufacturer’s guidelines.

Hytec is a flexible polypropylene sheet membrane, which offers exceptional mechanical properties suitable for the protection of concrete and steel structures.

A geotextile Integral Protective Layer was used in combination with the Hytec membrane.

  • Works completed to programme
  • Collaborative working with AMCO & the Department of Transport
  • Stirling Lloyd Hytec Sheet Waterproofing