Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031 A197/A1 Morpeth Inspection | Route One Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654
Route One Infrastructure were employed by National Highways to inspect 84 mechanical bearings on the A197 / A1 at Morpeth.
The structure is comprised of two independent sections, each with 3 spans. Each span has a fixed end and free/guided end. Monitoring was also installed on each span for a minimum of 48hours, recording displacement longitudinally, horizontally and vertically as well as the temperature.
The abutments were accessed on foot by climbing the revetments and the pier locations accessed by a MEWP. Due to the location, the inspection was undertaken at night over a two week period.
The report provided to Highways England contained our findings and included recommendations for remedial works on the bearings where required.