M4 Smart Motorway J3 to 12 – Lake End

Case Study

M4 Smart Motorway J3 to 12 – Lake End

Client: Balfour Beatty VINCI JV

Location: London

Products: The SX250 Type 5 mat joint and footway plates

Our works – The SX250 Type 5 mat joint and footway plates were designed and manufactured specifically for BBJV and their client National Highways. This was a complex job involving ECI between BBJV and Route One Infrastructure. The smart motorway works were carried out in April 2022 and we installed the joint over six shifts under a full road closure.

Simon Atkinson, Contracts Manager, had the following to say about the project:

‘We worked with BBJV to finalize the design and the installation program and we have now at last installed the joint successfully. We’re looking forward to working with BBJV again!’

Route One Infrastructure offer a range of expansion joints, for more information, contact us today.