Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
A52 Croft Cowbank Bridge | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One carried out the bridge deck preparation and waterproofing to Cowbank Bridge for Kier Services.

Case Study Case Study

A52 Croft Cowbank Bridge

Client: Kier Services (Highways)

Location: Yorkshire and the Humber

Products: Stirling Lloyd One Coat Eliminator

Operatives carried out open grit blasting and enclosed shot blasting before applying the spray applied bridge deck waterproofing.

The works were carried out over two separate shifts, under a lane closure and two-way traffic lights.

  • Stirling Lloyd Eliminator
  • Open grit blasting and enclosed shot blasting
  • Lane closure and two-way lights