Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the fontawesome handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home/r1ico/public_html/wp-includes/functions.php on line 6031
M1 J19 | Route One
Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 647

Warning: Trying to access array offset on value of type null in /home/r1ico/public_html/wp-content/themes/route-one/functions.php on line 654

Case Study

Route One are carrying out a large package of bridge works on six structures as part of a major scheme at Catthorpe Interchange.

Case Study Case Study

M1 J19

Client: Skanska

Location: East Midlands

Products: Eliminator, SA1030 and Asphaltic Plug Joints (Thormajoint ST)

Route One are carrying out a large package of bridge works on six structures as part of a major scheme at Catthorpe Interchange. The scheme will provide new links for M1, M6 and A14. The works include new expansion joints and waterproofing.

  • >40m lin of APJ completed within 4No shifts
  • >920m2 deck preparation (enclosed shot blasting)
  • One coat Eliminator waterproofing and SA1030 completed over 4No shifts
  • Drainage detail to T piece every metre and directed through air gap